Metallic epoxy flooring cost in Melbourne: what drives the price

What decides the price of a metallic epoxy floor in Melbourne: floor area, slab condition, moisture, design, finish and access. Plus how to compare quotes.

By Alistar, founder of VVS FloorsPublished 6 min read

If you have gone looking for a price per square metre for metallic epoxy, you will have noticed we don’t publish one. That isn’t secrecy. A metallic epoxy floor is hand-poured over your particular slab, and two floors of the same size can need very different amounts of work. This guide explains what actually moves the price in Melbourne, so you can read any quote, ours or someone else’s, and know what you are paying for.

The short version: the resin is only part of the cost. Preparation, the condition of your concrete and the design you choose make up the rest.

Why there is no flat rate

A metallic floor is not one product rolled on in an afternoon. We pour the Hychem Onyx Metallic Floor System, which is built from four layers: a primer, a coloured epoxy base, the metallic design coat and a clear sealer. Each layer has to bond to the one below it, and the first one has to bond to your concrete.

How much work that takes depends on what we find when we look at the slab. A new, clean, dry garage floor is a very different job from a 40-year-old slab with old paint, tile adhesive and a few cracks. A flat rate would have to overcharge the first customer or under-prepare the second floor. So we measure, test and price each floor on site, and the quote is free.

The seven things that drive the price

1. Floor area

Size matters, but not in a straight line. Travel, set-up, grinding equipment and the days needed for each coat to cure are much the same whether the room is small or large. That means a small floor usually works out dearer per square metre than a large one, and adding an adjoining room to the same job often costs less than you would expect.

2. The condition of your concrete

This is the biggest variable, and the one you can’t see from a photo of a finished floor. Every slab is diamond-ground to a CSP 2 profile, and laitance (the weak, dusty top layer), old coatings and contaminants are removed so the primer can grip sound concrete.

What adds work:

  • old paint, sealers or tile adhesive that have to be ground off
  • cracks, chips and holes that need repair
  • oil or other contamination, common in older garages
  • uneven or weak patches that need rebuilding

A slab in good condition needs less of all of this. We will tell you what yours needs after we have seen it.

3. Moisture in the slab

Concrete holds moisture, and vapour pushing up through a slab can blister a resin floor. We test moisture on site before anything is applied. If the readings are fine, nothing extra is needed. If they are high, a moisture-vapour barrier goes down before the primer. It is an extra layer with its own material and time, so it adds to the price, but only where the test shows the floor needs it.

4. The design you choose

The Onyx range has 42 metallic and pearl pigments, and colours can be blended. A soft, single-tone floor is simpler to pour than a dramatic multi-colour design with strong veining. More complex designs can take more material and more time on the pour, which shows up in the quote. Have a look through the colour range and tell us which colours caught your eye, so we can price the look you actually want.

5. The finish on top

The standard top coat is a high-gloss clear sealer. If you prefer a low-glare look, the sealer can be switched to satin or matte. In garages and areas that may get wet, a fine anti-slip aggregate can be added to the top coat. These are choices, not upgrades you need, and each one is listed separately in your quote.

6. Access and logistics

Getting equipment and materials to the floor takes time. A ground-level garage with driveway parking is simple. An apartment with a lift booking, a first-floor room up a flight of stairs or a shop that can only be worked on after hours takes more planning and more labour. For commercial spaces, staging the work around trading hours also affects the price.

7. Edges, steps and details

Open, rectangular floors are the quickest to pour. Steps, door thresholds, drains, floor joints, columns and tight corners all need hand detailing. None of these is a problem, but each takes time, and a floor with a lot of them costs more than a plain one of the same area.

What a proper quote should spell out

Whoever you get quotes from, look for these in writing:

  1. The preparation. Is the slab being diamond-ground, and to what profile? Are crack repairs included?
  2. Moisture testing. Has the slab been tested, and what happens if readings are high?
  3. The system. Which products, and how many layers? Are they from one manufacturer and designed to work together?
  4. The design and finish. Colours, sheen and any anti-slip.
  5. The area and the price. A fixed figure for a measured area, not an estimate.
  6. Timing. Start date, days on site and when you can use the floor again.
  7. Warranty. What is covered, by whom, and for how long.

If any of those are missing, ask. A good installer will be glad you did.

Why two quotes can be far apart

When one price is much lower than another for the same room, the difference is usually in what you can’t see once the floor is finished:

  • Preparation. Acid washing or a light sand is quicker than diamond grinding, but it does not give the same bond.
  • Layers. Leaving out a primer or a body coat saves material and a day on site.
  • Mixed products. Combining layers from different brands can be cheaper, but nobody stands behind the floor as a whole.
  • Moisture. Skipping the test costs nothing on the day and can cost the whole floor later.

Compare what is being done, not just the bottom line. The questions in the list above make that easy.

Keeping the cost down without cutting corners

There are sensible ways to help the budget:

  • Empty the space fully before we arrive, including shelving and anything stored against the walls.
  • Do adjoining areas in one visit rather than coming back for a second room later.
  • Send clear photos and rough sizes with your enquiry, so the site visit is quick and the quote is accurate the first time.
  • Tell us about the slab’s history: old coatings, past leaks or damp, or anything spilled on it.
  • Be flexible on dates if you can. It lets us schedule efficiently.

What we would not trim is the preparation. It is the part of the job you never see, and the part that decides how long the floor lasts.

Getting a price for your floor

Send us a few details and a photo through the quote form. We reply within 24 hours, arrange a time to measure and test the slab, and bring real samples so you can see the colours in your own light. You then get a fixed, itemised quote with the system, the preparation and the finish set out line by line.

If you are still weighing up your options, our guide to metallic epoxy, polished concrete and tiles compares the three, and the day-by-day install guide explains how long your space will be out of use.

  • Cost
  • Quotes
  • Preparation
  • Melbourne

Questions

Quick answers.

How much does a metallic epoxy floor cost per square metre in Melbourne?

There is no single rate that is honest for every floor. The price depends on the floor area, the condition of the concrete, whether a moisture barrier is needed, the design and the finish. We measure and test on site, then give you a free, fixed written quote.

Why is metallic epoxy priced higher than a standard garage coating?

A metallic floor is a four-layer system (primer, coloured epoxy base, a hand-worked metallic design coat and a clear sealer) on a diamond-ground slab. There is more material, more preparation and more skilled time in it than in a single roll-on coating.

Is the quote free, and is the price fixed?

Yes. The site visit and written quote are free. The quote is itemised and fixed for the scope it describes. If the slab needs extra work, you hear about it before we start, not on the invoice.

Can I lower the price by preparing the concrete myself?

Not the grinding. The slab has to be diamond-ground to the profile the system needs, and the bond of the whole floor depends on it. You can help by emptying the space completely and making access easy, which saves time on site.

Does a bigger floor cost less per square metre?

Usually, yes. Travel, set-up and the days needed for each layer to cure are much the same for a small room as for a large one, so those costs are spread further on a bigger floor.